Hotline
13794321818
scan Wechat to get free sample
Profession is strength
service telephone :020-82257686
SMT and PCBA OEM consulting :
Mr. Zeng:137-9432-1818
Miss Liao:136-6088-3282
Product solution development and layout outsourcing consulting:
Mr. Pan:133-9268-9398
Supplier contact:
Miss Deng:QQ:2986522841
2023-04-26 13:53:18
PCBA Outsourcing Production Technology Quality Agreement
Technical Quality Agreement; first party:; Party B:; Both parties ensure product quality, clarify the responsibilities of both supply and demand, and adhere to equality** Item: [Purpose]; 1. This agreement is responsible for ensuring technical, quality, and environmental issues; 2. Both Party A and Party B shall strictly abide by the provisions and requirements of each clause of this agreement; Article 2: [Specifications]; Both parties have fully negotiated the following matters before introducing the product:; 1. Technical support; 1.1 During the cooperation period between Party A and Party B, Party A shall be responsible for the time specified in the order; 1.2 When Party A proposes a process change, Party B must strictly
Technical Quality Agreement
first party:
Party B:
In order to ensure product quality and clarify the responsibilities of both parties, both parties sign the following technical quality agreement based on the principles of equal cooperation and common development.
**Item: [Purpose]
1. This agreement is to ensure the responsibility and solutions for technical, quality, and environmental issues.
2. Both Party A and Party B shall strictly abide by the provisions and requirements of each clause of this agreement. If batch quality problems or quality accidents occur due to violation of the agreement, the defaulting party shall bear full responsibility and make compensation for losses in accordance with the provisions of this agreement.
Article 2: [Specifications]
Both parties have fully negotiated the following matters before introducing the product:
1. Technical support
During the cooperation period between Party A and Party B, Party A shall be responsible for providing Party B with production BOM, engineering changes, corresponding PCB layout and Gerber documents within the time specified in the order. Party B shall complete the production technical preparation work for PCBA processing on its own.
1.2 When Party A proposes a process change, Party B must strictly implement the process change. The first party is responsible for making changes to products that have already entered the first party's warehouse, while the second party is responsible for making changes to products that have not entered the first party's warehouse. During this process, Party A requests Party B to change the heavy work costs incurred, and after confirmation by Party A, the heavy work costs shall be borne by Party A.
1.3 The first party has the right to send personnel to the second party's site to evaluate and monitor the production process of the second party in terms of technology, quality, and other aspects, and require the second party to carry out a deadline and effective rectification of specific operational non conformities.
1.4 The second party must use FCT, AOI, or ICT testing during production. The second party has the right to make reasonable requirements for the raw materials, technical data, tooling, auxiliary materials, etc. provided by the first party based on the production situation. The first party should solve the problem before the next batch of production.
1.5 When Party A terminates the contract with Party B, Party B must return all means of production provided by Party A (including production BOM, engineering changes, corresponding SMT production procedures, material station details, tooling tools, instruments, testing fixtures, etc.) to Party A in good condition. The losses arising from this shall be borne by Party B.
1.6 Party A and Party B shall maintain communication and learn from each other, including production technology and management experience.
1.7 Party B must use the solder strip/flux with the model and composition specified by Party A, and the solder paste/patch adhesive with the brand and model specification specified by Party A.
1.8 The materials returned by Party B to the warehouse must be returned to Party A's procurement center in their original packaging. Party B shall be responsible for compensating for any non-conforming materials confirmed to be caused by Party B.
1.9 The second party must arrange maintenance personnel to follow the line for maintenance. The printed boards required to be repaired must be completed within 24 hours. The time limit for exporting machines is based on the actual shipping demand. If there are special circumstances, both parties shall negotiate and resolve them.
1.10 If the repair is defective due to the quality issues identified by Party A for the batch of materials, Party B shall provide the defective materials for confirmation by relevant departments of Party A and replace them one-on-one free of charge. For discrete material quality issues that occur in daily life, such as poor appearance (including poor weldability) and affect the use of materials, both parties confirm that Party B shall be responsible for those defined as Party B's responsibility, and Party A shall be responsible for those defined as Party A's defective incoming materials. If the processed products cannot be repaired or scrapped due to the reasons of Party B, Party B shall bear the corresponding losses of the finished products.
1.12 If Party A has completed CQC certification for component products that are processed by Party B, Party B needs to apply for and record changes in the production factory information of the CQC products to the certification agency on its own. Only after obtaining the certification of changes in the production factory information can Party A's CQC certified products be produced at Party B's processing plant. The fees required for certification shall be borne by Party B.